we've been going to the bus everyday lately. we've barely been home. so busy!
- i finished painting the windows with the elastomeric roof coating.
- i finished painting the step
- steven finished the first coat of roof paint
- we hung walls! (except for behind the bathtub)
- we painted the living room area walls
- i cut out some sheet metal panels and glued them down in the front floorboard area
- steven cut out/reconnected the heater hoses in the engine.
- i washed/painted the metal pieces that were in between the windows but ended up not using them. i glued strips of wood on instead.
No comments:
Post a Comment