Monday, April 18, 2011

kitchen tour

for ella!

from left to right - RV range (with a broken handle and missing knob) sitting on a custom cabinet.
- the cabinet that came with the bus. it has a new counter and a sink. raised up 7 inches and drawers stuck underneath.
- the blue cooler on the floor has a spout. it sits on the counter to wash dishes with. the sink empties into a galvanized bucket under the counter.
- on the wall, the top shelf holds 10 - 1/2 pint canning jars. the bottom 2 shelves hold pint size jars. the green are 2 lunchboxes screwed to the wall to hold sauces or other kitchen stuff.


- on the other side - the repainted ice box is sitting on top of the mini-fridge. we haven't even plugged the fridge in it. no idea if it even works at this point.
- the wooden cabinet is the trash can. the front door opens to get the bag out.

- inside the icebox, a cooler filled with ice and 2 jugs of water fit perfectly in the bottom. i'll have to fit a couple shelves in later.

the bed!

we started the bed this weekend. exciting!

it's going to go across the entire back of the bus.

except the center is going to lift up so we will still be able to use the back door.


we build one side on sunday.


then today the boys and i went over to cover the front and lay it in place.

i used the staple gun and stapled some leftover ceiling panels down. nicholas and noah hammered them in all the way.

then we cleared out the side and fit it into place.

it's going to have a 3/4" piece of ply on top with a hinge on the wall side so we can get under there for storage.

the other side is going to look the same with the hinge against the wall to get underneath. it is also going to have another hinged board to flip out to go across the center.



shelf above the bed. (the last one got scrapped) it fits 2 medium sized baskets and 3 small ones.

Friday, April 15, 2011

ceiling!

the ceiling is done!!! holy moly!

this took for.ev.er.
it's a little lumpy in places but it's nothing a little glue can't fix. the right side is a lot nicer than the left because we had more practice :D

we made an enormous mess.
yep, big mess.
but it's mostly cleaned up now!

Monday, April 4, 2011

update!

my camera's been lost so i haven't been able to update!

we've done a lot of exciting things!

i painted the ice box white to match the fridge.
we are going to lay it down and use it like a chest so the ice will be use more efficiently because the cool air stay inside when we open the door.

we redid the ceiling with strips of hard plywood. there are a few bubbles here and there that need some guerrilla glue but other than that, i think it looks pretty good. it reminds me of cedar siding on a house by the beach.

we raised up the counter and slide a couple drawers underneath. they still need to be painted.

we build a cabinet for the oven to sit on. our pot and pans are going to go in there.

i put a little shelf in the back above where the bed is going to be.

i got myself a new computer chair to go in front of my desk. i chose to not be practical about it because being practical sucks.


build a lovable loo!

Sunday, March 13, 2011

we have a wall!

i started putting the ceiling up. holy moly! it's hard! the most difficult thing i've done on the bus so far.

i put up foil bubble wrap insulation first, then screw the boards on , then stuffed insulation in between. i needed to take a break from putting the ceiling up so i did enough so i could finally put a wall up. it's in between the sink cabinet and the bathtub. getting the curve just right to fit was impossible so there are a couple gaps. whatev.

the blue is a little shelf. it holds 10 - 1/2 pint mason jars. there are going to be 3 more shelves under it. 2 for pint size mason jars and 1 for quart size.

i brought over steven's bachelor pad fridge. it's going to sit about 8 inches from the edge of the bunk bed. it's enough room for them to wiggle their skinny bodies up to the top. i'm going to build a cabinet for the fridge and ice box to sit in with a little shelf over top.

we aren't sure if we are going to use the fridge as a freezer with a shelf dedicated to making ice for the ice box. or if we are going to use the fridge as a fridge and have the ice box be general storage. not really important now but it's something to think about.


i'm in the beginning research stages to set up a solar system to run the fridge.

Sunday, February 20, 2011

exciting!



the bus is really starting to come together! i'm super excited about it.

nicholas and i painted the bottom of the walls blue with some oops paint.

we got a futon yesterday. it was $299 at big lots. not so bad. i don't think it really even looks like a futon. it doesn't have those wretched bars either. one really nice thing about this one is that you can lift up the seat and there is a big storage area underneath.


i also moved a bunch of cabinets from home:

~ the purple and green cabinet with the kitchen sink that i refinished from the cabinet that was in the bus when we got it
~ 2 tall shelves are going to be my and steven's desks.
~ 2 toy cabinets for the boys (there's another bigger cabinet to sit on top of these 2 but they need it at home for now.)
~ a shoe shelf for right next to the door
we have a couple more to bring over later too but they can wait.

they need to keep the couch box for their fort :P

up next is the ceiling! come on, tax return!

Tuesday, February 15, 2011

cubby hole

i wasn't sure what i was going to do in the front under the dash behind the door. i knew i wanted some kind of storage. i was thinking shelves with a door and a door but, eh, i didn't really want to actually do it. a storage bin is way easier. so that's what i did! :P

we are planning on having it be for sweatshirts/coats so they will be close to the door.

it's the same color as the walls. i got an opps quart for $4 at lowes last week. i actually really like it. with the greenish and purple, it gives a beachy feel. at least i think it does. steven either doesn't think so... or doesn't care... i can't tell. :P

Monday, February 14, 2011

blog neglect

we've been going to the bus everyday lately. we've barely been home. so busy!

- i finished painting the windows with the elastomeric roof coating.
- i finished painting the step
- steven finished the first coat of roof paint
- we hung walls! (except for behind the bathtub)
- we painted the living room area walls
- i cut out some sheet metal panels and glued them down in the front floorboard area
- steven cut out/reconnected the heater hoses in the engine.
- i washed/painted the metal pieces that were in between the windows but ended up not using them. i glued strips of wood on instead.

Wednesday, February 2, 2011

finished steps! woot!

i finished the step yesterday. i put a piece of plywood over the 3 2x4s. i needed to sand down the front corner so the door would close.

then i siliconed some short pieces of ply around the edges to close up any gaps.

then everything got a coat of purple. i'll have to go back and give it a couple more coats. but all the major stuff is finished.

nicholas cut out a light we didn't need.

it was a long day. noah fell asleep using his lunchbox as a pillow. haha

today, it was too cold and windy to go over. we went shopping instead. i wanted to check out some sticky carpet tile for the cockpit area. they wanted $3/sqft. yikes. they were like $8 per tile.

so i was looking at rubber floor tiles. they were even more expensive. like $9 a piece.

i kept going to foam floor tiles. they had grey ones for $19 for 16sqft. not so bad.

they had some kid's room alphabet ones $18 for 26sqft. winner! i got 2 packs.

i also got another gallon of elastomeric roof paint, a quart of low voc contact cement and another paint roller thingy because steven broke the last one.

we came home and set up the tiles on the living room floor. they love them. :)

Monday, January 31, 2011

bottom step

today i worked on the bottom step. i'd been avoiding it because i wasn't exactly sure how i could fix it. it was completely rusted through.

the whole step was being held up by about 3 inches on the left side. someone put a huge heavy piece of steel over top. it spread the weight out but it was still pretty dangerous.

first i cut out the old rusty step. i had to cut it in half so i could close the door and stand on the ground to cut behind the door. once i got it off, i slathered some rust converter on the edges.

i bolted some reclaimed wood to the sides of the step on either side. then hung 2x4's across the bottom. i glopped some rubber cement on the nuts to keep them from vibrating open.

tomorrow, i'm going to cut some plywood to fit over top.

Sunday, January 30, 2011

roof/window painting

yes, that is my 4 year old wearing dress pants, an oxford shirt and sweater vest pressure washing the roof of a school bus.

we got a can of elastomeric roof coating (compliments of my sister and her $50 lowes gift card christmas present. thank you, catie!) steven painted (most of) the roof today, while i did the windows. i'm going to paint the inside of the windows too for extra heat protection. steven needs to do the second roof coat next weekend.

steven also got the heater hoses capped off. finally. :P

bunks

we finally finished something! the boys bunk beds are done and ready for sleeping! (not like they will even sleep in them anyway. haha)

we raised up the bottom bunk about 5 inches. i didn't want it too close to the wheel well because i thought it need more insulation space than what there was before.


i build a little box for around the wheel well to hold some insulation. when the bunks are in their final position, it will be screwed to the floor. for right now, it's just sitting there.

i put some foil bubble wrap style insulation in the wheel well box. then i put 3 fleece blankets that were in our yard sale pile over top. i think there were 12 layers of fleece total.

i used a mattress we already had for nicholas' top bunk. i just cut it down to fit. i made noah a new one from a foam mattress topper ($36 for a king size)and the cut off from nicholas' mattress.

i wrapped it in an old sheet and tacked it with embroidery floss (left over from 7th grade bracelet making) so the layers won't shift.

we need to reinforce the legs where they stack but other than that, done!

bonus pic of the beach the other day :)