this took for.ev.er.
Friday, April 15, 2011
ceiling!
the ceiling is done!!! holy moly!
this took for.ev.er.
it's a little lumpy in places but it's nothing a little glue can't fix. the right side is a lot nicer than the left because we had more practice :D
we made an enormous mess.
yep, big mess.
but it's mostly cleaned up now!
this took for.ev.er.
Monday, April 4, 2011
update!
my camera's been lost so i haven't been able to update!
we've done a lot of exciting things!
i painted the ice box white to match the fridge.
we are going to lay it down and use it like a chest so the ice will be use more efficiently because the cool air stay inside when we open the door.
we redid the ceiling with strips of hard plywood. there are a few bubbles here and there that need some guerrilla glue but other than that, i think it looks pretty good. it reminds me of cedar siding on a house by the beach.
we raised up the counter and slide a couple drawers underneath. they still need to be painted.
we build a cabinet for the oven to sit on. our pot and pans are going to go in there.
i put a little shelf in the back above where the bed is going to be.
i got myself a new computer chair to go in front of my desk. i chose to not be practical about it because being practical sucks.

build a lovable loo!
we've done a lot of exciting things!
build a lovable loo!
Sunday, March 13, 2011
we have a wall!
i started putting the ceiling up. holy moly! it's hard! the most difficult thing i've done on the bus so far.
i put up foil bubble wrap insulation first, then screw the boards on , then stuffed insulation in between.
i needed to take a break from putting the ceiling up so i did enough so i could finally put a wall up. it's in between the sink cabinet and the bathtub. getting the curve just right to fit was impossible so there are a couple gaps. whatev.
the blue is a little shelf. it holds 10 - 1/2 pint mason jars. there are going to be 3 more shelves under it. 2 for pint size mason jars and 1 for quart size.
i brought over steven's bachelor pad fridge. it's going to sit about 8 inches from the edge of the bunk bed. it's enough room for them to wiggle their skinny bodies up to the top. i'm going to build a cabinet for the fridge and ice box to sit in with a little shelf over top.
we aren't sure if we are going to use the fridge as a freezer with a shelf dedicated to making ice for the ice box. or if we are going to use the fridge as a fridge and have the ice box be general storage. not really important now but it's something to think about.

i'm in the beginning research stages to set up a solar system to run the fridge.
i put up foil bubble wrap insulation first, then screw the boards on , then stuffed insulation in between.
i needed to take a break from putting the ceiling up so i did enough so i could finally put a wall up. it's in between the sink cabinet and the bathtub. getting the curve just right to fit was impossible so there are a couple gaps. whatev.the blue is a little shelf. it holds 10 - 1/2 pint mason jars. there are going to be 3 more shelves under it. 2 for pint size mason jars and 1 for quart size.
i brought over steven's bachelor pad fridge. it's going to sit about 8 inches from the edge of the bunk bed. it's enough room for them to wiggle their skinny bodies up to the top. i'm going to build a cabinet for the fridge and ice box to sit in with a little shelf over top.we aren't sure if we are going to use the fridge as a freezer with a shelf dedicated to making ice for the ice box. or if we are going to use the fridge as a fridge and have the ice box be general storage. not really important now but it's something to think about.

i'm in the beginning research stages to set up a solar system to run the fridge.
Sunday, February 20, 2011
exciting!
the bus is really starting to come together! i'm super excited about it.
nicholas and i painted the bottom of the walls blue with some oops paint.
we got a futon yesterday. it was $299 at big lots. not so bad. i don't think it really even looks like a futon. it doesn't have those wretched bars either. one really nice thing about this one is that you can lift up the seat and there is a big storage area underneath.
i also moved a bunch of cabinets from home:
~ the purple and green cabinet with the kitchen sink that i refinished from the cabinet that was in the bus when we got it
~ 2 tall shelves are going to be my and steven's desks.
~ 2 toy cabinets for the boys (there's another bigger cabinet to sit on top of these 2 but they need it at home for now.)
we have a couple more to bring over later too but they can wait.
up next is the ceiling! come on, tax return!
Tuesday, February 15, 2011
cubby hole
i wasn't sure what i was going to do in the front under the dash behind the door. i knew i wanted some kind of storage. i was thinking shelves with a door and a door but, eh, i didn't really want to actually do it. a storage bin is way easier. so that's what i did! :P
we are planning on having it be for sweatshirts/coats so they will be close to the door.
it's the same color as the walls. i got an opps quart for $4 at lowes last week. i actually really like it. with the greenish and purple, it gives a beachy feel. at least i think it does. steven either doesn't think so... or doesn't care... i can't tell. :P
we are planning on having it be for sweatshirts/coats so they will be close to the door.
it's the same color as the walls. i got an opps quart for $4 at lowes last week. i actually really like it. with the greenish and purple, it gives a beachy feel. at least i think it does. steven either doesn't think so... or doesn't care... i can't tell. :P
Monday, February 14, 2011
blog neglect
we've been going to the bus everyday lately. we've barely been home. so busy!
- i finished painting the windows with the elastomeric roof coating.
- i finished painting the step
- steven finished the first coat of roof paint
- we hung walls! (except for behind the bathtub)
- we painted the living room area walls
- i cut out some sheet metal panels and glued them down in the front floorboard area
- steven cut out/reconnected the heater hoses in the engine.
- i washed/painted the metal pieces that were in between the windows but ended up not using them. i glued strips of wood on instead.
- i finished painting the windows with the elastomeric roof coating.
- i finished painting the step
- steven finished the first coat of roof paint
- we hung walls! (except for behind the bathtub)
- we painted the living room area walls
- i cut out some sheet metal panels and glued them down in the front floorboard area
- steven cut out/reconnected the heater hoses in the engine.
- i washed/painted the metal pieces that were in between the windows but ended up not using them. i glued strips of wood on instead.
Wednesday, February 2, 2011
finished steps! woot!
i finished the step yesterday. i put a piece of plywood over the 3 2x4s. i needed to sand down the front corner so the door would close.
then i siliconed some short pieces of ply around the edges to close up any gaps.
then everything got a coat of purple. i'll have to go back and give it a couple more coats. but all the major stuff is finished.
nicholas cut out a light we didn't need.
it was a long day. noah fell asleep using his lunchbox as a pillow. haha
today, it was too cold and windy to go over. we went shopping instead. i wanted to check out some sticky carpet tile for the cockpit area. they wanted $3/sqft. yikes. they were like $8 per tile.
so i was looking at rubber floor tiles. they were even more expensive. like $9 a piece.
i kept going to foam floor tiles. they had grey ones for $19 for 16sqft. not so bad.
they had some kid's room alphabet ones $18 for 26sqft. winner! i got 2 packs.
i also got another gallon of elastomeric roof paint, a quart of low voc contact cement and another paint roller thingy because steven broke the last one.
we came home and set up the tiles on the living room floor. they love them. :)
so i was looking at rubber floor tiles. they were even more expensive. like $9 a piece.
i kept going to foam floor tiles. they had grey ones for $19 for 16sqft. not so bad.
they had some kid's room alphabet ones $18 for 26sqft. winner! i got 2 packs.
i also got another gallon of elastomeric roof paint, a quart of low voc contact cement and another paint roller thingy because steven broke the last one.
we came home and set up the tiles on the living room floor. they love them. :)
Subscribe to:
Posts (Atom)