Tuesday, October 26, 2010

floor done!

library today! their favorite day!

after the library, we went over to the bus and finished the floor. i only had to cut 9 pieces. 2 to fit on the front of the right wheel well and 7 along the side. not too bad.
i used 6 boxes of flooring. there are 11 left, including the 4 that are different. i think i'm going to use the different ones on the inside of the boys bunks.

i think we are going to start raising the roof this weekend.

No comments:

Post a Comment